Replacement for North Carolina coastal bridge now open

News
New_Bonner_Bridge_s_official_opening_dat_0_73440943_ver1.0_640_360_1550507186186.jpg

The replacement for an aging bridge on North Carolina’s Outer Banks is now open.

N.C. Department of Transportation says in a news release that the new bridge over Oregon Inlet opened to traffic on Monday at 12:20 p.m.

Construction began on the $252 million bridge in March 2016. The new bridge is 2.8 miles (4.5 kilometers) long and rises 90 feet (27 meters) above Oregon Inlet at its highest point.

The new bridge replaces the Herbert C. Bonner Bridge, which was built in 1963 and is scheduled to be demolished by the end of the year.

Officials say 1,000 feet (304 meters) of the old bridge will be preserved as a pedestrian walkway.

A formal dedication of the bridge is scheduled for April 2.
 

Copyright 2020 Nexstar Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

LKQD Outstream

Trending Stories

news-app-download-apple-350x50news-app-download-android-350x50